Truth about impact of the Lower Thames Crossing on local roads revealed at public meeting

Consultation on LTC design revisions is ending on Wednesday (August 12)

There was a healthy turn-out to a meeting from people keen to see copies of the latest Lower Thames Crossing design consultation.
The event, organised by the Gravesham committee of CPRE Kent and Meopham residents, gave all the chance to ask questions about the revised design proposals. It had been set up in view of Highways England’s belief that the documents being displayed only in Rochester Library was sufficient south of the river.
None of the many visitors at the meeting, held at Meopham Cricket Pavilion on Friday, July 31, realised that the junction of the tunnel access road and A2 would result in the A2 being reduced to two lanes in each direction at this point.
This pinch point is likely to cause huge congestion on the A2 and as a result greatly increase traffic on local roads such as the A227.

  • You can read more on the latest consultation here

Monday, August 10, 2020

Come and speak to us at Lower Thames Crossing display in Meopham

There’s little over a fortnight left to join the consultation

Highways England is consulting on further revisions to the design of the Lower Thames Crossing.
Details are available online or at Rochester Library and consultation closes on Wednesday, August 12.
If you would like to see copies of the Design Refinement Guide and Maps, they will be available tomorrow (Friday, July 31) from 10am-6pm at Meopham Cricket Pavilion, Meopham Green (opposite the windmill).
Members of CPRE Kent will be at the cricket pavilion tomorrow and all are welcome to come and speak with them.
The proposed location of the new tunnel and the drastic reduction in width of the A2 increases the risk of vehicles using the A227 and surrounding lanes as rat-runs.
The project involves the loss of two lanes on the coastbound A2 after the Gravesend East junction, and the Highways England map suggests that the A2 westbound reduces to two lanes before the Thong Lane green bridge.
This is to accommodate the new crossing, yet it is not that long ago it was widened to avoid tailbacks. These pinch points will greatly increase the risk of congestion on the A2, especially at peak time.
Further, traffic is likely to increase on roads in Higham, Cobham, Istead Rise, Luddesdown, Riverview and Sole Street, as well as on A-roads like the A226 and A227 through Meopham.
The new crossing has been predicted to cost £8 billion, but this does not include a long list of essential mitigation that will be needed on places like the Tollgate interchange, A227, A228, A229 and A249. Many are questioning why Kent County Council should have to pay for works that are effectively part of the project.
One last thing, for now at least: the proposed crossing will destroy Green Belt countryside, wrecking parts of Jeskyns and Shorne Wood parks.
There will of course be no benefit to local residents.
The consultation documents are not easy to read online, so we suggest you request a copy of them. This can be done by calling 0300 123 5000 or emailing Highways England at info@lowerthamescrossing.co.uk
You only have till until 23.59 on Wednesday, August 12, to contribute to the consultation, so please go to the Highways England consultation website here
Make your voice heard!

  • For more on the Lower Thames Crossing, click here

Thursday, July 30, 2020