Come and speak to us at Lower Thames Crossing display in Meopham

There’s little over a fortnight left to join the consultation

Highways England is consulting on further revisions to the design of the Lower Thames Crossing.
Details are available online or at Rochester Library and consultation closes on Wednesday, August 12.
If you would like to see copies of the Design Refinement Guide and Maps, they will be available tomorrow (Friday, July 31) from 10am-6pm at Meopham Cricket Pavilion, Meopham Green (opposite the windmill).
Members of CPRE Kent will be at the cricket pavilion tomorrow and all are welcome to come and speak with them.
The proposed location of the new tunnel and the drastic reduction in width of the A2 increases the risk of vehicles using the A227 and surrounding lanes as rat-runs.
The project involves the loss of two lanes on the coastbound A2 after the Gravesend East junction, and the Highways England map suggests that the A2 westbound reduces to two lanes before the Thong Lane green bridge.
This is to accommodate the new crossing, yet it is not that long ago it was widened to avoid tailbacks. These pinch points will greatly increase the risk of congestion on the A2, especially at peak time.
Further, traffic is likely to increase on roads in Higham, Cobham, Istead Rise, Luddesdown, Riverview and Sole Street, as well as on A-roads like the A226 and A227 through Meopham.
The new crossing has been predicted to cost £8 billion, but this does not include a long list of essential mitigation that will be needed on places like the Tollgate interchange, A227, A228, A229 and A249. Many are questioning why Kent County Council should have to pay for works that are effectively part of the project.
One last thing, for now at least: the proposed crossing will destroy Green Belt countryside, wrecking parts of Jeskyns and Shorne Wood parks.
There will of course be no benefit to local residents.
The consultation documents are not easy to read online, so we suggest you request a copy of them. This can be done by calling 0300 123 5000 or emailing Highways England at info@lowerthamescrossing.co.uk
You only have till until 23.59 on Wednesday, August 12, to contribute to the consultation, so please go to the Highways England consultation website here
Make your voice heard!

  • For more on the Lower Thames Crossing, click here

Thursday, July 30, 2020

Comments are closed.